Grimmestrasse |
||
Project |
Arch bridge „Grimmestrasse“ |
![]() Arch during Construction ![]() Finished Structure ![]() Finished Structure |
|---|---|---|
Client |
Landschaftsverband Westfalen-Lippe |
|
Facts |
Arch bridge |
|
Description |
In order to re-route the road B 229 over the A 46 motorway it was necessary to build the arch bridge „Grimmestraße“. The bridge consists of a massive concrete deck, which is supported by two rows of prismatic columns. The central columns are positioned on a massive concrete arch, whereas the columns at either end as well as the abutments are based directly on the bedrock. |
|