Park Deck Technologiepark - Paderborn

Project

Parkpalette Technologiepark
Paderborn


Fertige Stellplatzanlage

Betonierabschnitt

Innenansicht

Client

Technologiepark Paderborn GmbH


Architect

Roland Dorn
Paderborn / Cologne


Facts

Parking spaces: 207
Floors: 2 Gross surface area: 2,100 mē
Spanns: 16.5 m
Building period: approx. 4 months


Desciption

The top level deck is a vaulted concrete floor plate with a span of 16.5 m. It was made as a pre-stressed seamless floor plate. The car park measures 127.0 x 16.5 m. The standard distance between pillars are 7.4 m. Four pillars in the center of the construction stabilize the whole building. The elongation is carried by joints at the ramps. The prestressing was realized with unbonded steel tendons with a polyethylene coating (Monolitze). The prestressed floor is waterproof and needs no additional coating.



back